A nuclear reactor runs on the lunar surface for a year

Not yet

A lunar night lasts two weeks, so any permanent base needs power that does not come from the Sun. A small fission reactor of a few tens of kilowatts is the planned answer; on January 13th, 2026 the US space agency and energy department announced a 2030 target for a reactor on the lunar surface, a target rather than a flight. It is the planned power source for mining, refining, and a permanent outpost, and since September 25th, 2026 one of three routes to the power they need (E-power-through-the-lunar-night-at-a-surface-site).

The test: what counts as it having happened

A fission reactor on the lunar surface makes at least forty kilowatts of net electrical output available to external loads for at least ninety percent of a twelve-month period, confirmed by the responsible agency's mission record.

Settled by: The responsible agency's mission record

The odds, by how long I live

baselineto 2071 ± 8moderateto 2080strongto 2095radicalto 2136openno deadline
70%80%90%95%96%

Each column is a different guess at how long I live, from current trends (baseline) to open-ended. The number is the chance this happens before that deadline, assuming everything it depends on happens first. As of September 19th, 2026.

Why these numbers: The schedule has already slipped to the early 2030s and reactor programs slip more than most, but two space agencies and a rival national program are all aimed at it.

What this one is worth

If this happened tomorrow and nothing else changed, the chance that I live and work off Earth by 2071 goes from 0.5% to 0.4% (too small to tell apart from chance). If it turned out no, the same number goes to 0.5% (too small to tell apart from chance).

Longevity scenario baseline2071 ± 8moderate2080strong2095radical2136openno deadline
The headline as it stands 0.5%1.2%3.8%11%15%
If this settled yes now 0.4%1.2%3.9%11%15%
If this settled no now 0.5%1.3%3.8%11%15%

This is what the site says in advance, before the thing happens. When it does, the ledger entry that records it quotes this figure beside what actually followed, so a reader can see whether the prediction held. Worked out at the run 2026-10-11-scan by holding this step at each outcome in turn and playing the whole tree out again, 20,000 times per scenario. That is a throw of the dice, so a move smaller than about 0.10 points is inside the noise rather than a finding.

What the ledger says about this step

The last 3 checks

Once a week the tree is read against the news, node by node, against the test above. Open a line to see what that week held. Every check ever made on this node is on the Radar page.

  • 2026-11-01 Nothing new

    No new schedule or award news dated in the window; results were older NASA and DOE design-phase coverage and 2025 to early 2026 China and Russia lunar plant plans (mid-2030s).

  • 2026-10-04 Nothing new

    Idaho National Laboratory's request for information on Fission Surface Power closed September 8th, 2026, with a request for proposals to follow, and the target remains about 2030. Plans and procurement steps only, no reactor operating.

  • 2026-09-19 No change

    NASA's SPARC or Lunar Reactor-1 solicitation for a 20 kilowatt lunar flight system remains a draft as of September 1st, 2026, with no contractor selected; the January 2026 NASA-DOE agreement targeting a reactor by 2030 remains the operative plan. This is procurement-process news, not hardware progress toward operation.

    source 1source 2

Revisions

DateFieldFromToWhy
2026-09-19 resolution 'delivering at least forty kilowatts ... operates ... for twelve continuous months' at least forty kilowatts of net electrical output available to loads for at least ninety percent of a twelve-month period Step 27 outside-model review, item 64 (docs/reviews/2026-09-19-rulings.md): 'twelve continuous months' would have failed on a single maintenance outage, and net output to loads was unspecified. Decided September 19th, 2026.
2026-09-19 description 'aimed at the end of this decade ... plans delivery of a reactor to the launch pad in the early 2030s' the 2030 target announced 2026-01-13, dated Step 27 outside-model review, item 64: the description needed a dated update; the release of January 13th, 2026 was fetched and checked. Decided September 19th, 2026.
2026-09-25 description 'It is the power source that mining, refining, and a permanent outpost assume.' the planned power source, and since 2026-09-25 one of three routes to power through the lunar night Candidate 1 of docs/proposal-function-over-route-2026-09-25.md, I approved September 25th, 2026: lunar material at scale now depends on the function step E-power-through-the-lunar-night-at-a-surface-site, with this reactor as one route under it. Text only; the reactor's criterion and numbers are unchanged.

Notes

Drafted as a leaf; moved to mid on September 8th, 2026 after checking the program's schedule, which has slipped to the early 2030s. NASA release of January 13th, 2026 setting a 2030 surface-reactor target fetched September 19th, 2026.


Think this estimate is wrong? Here's how to tell me, and what happens next. The record itself is data/E-energy.toml in the public repository.