The tree · Access · Happens to the world · Could be decided within 1 to 5 years

I complete my current training program

Not yet

The gate on the whole branch. Everything downstream, in my current career or a civilian one, assumes the qualification. Expected May 2027.

The test: what counts as it having happened

I complete my current training program, confirmed by a dated record of completion.

Settled by: The dated record of completion

The odds, by how long I live

baselineto 2071 ± 8moderateto 2080strongto 2095radicalto 2136openno deadline
85%85%85%85%85%

Each column is a different guess at how long I live, from current trends (baseline) to open-ended. The number is the chance this happens before that deadline, assuming everything it depends on happens first. As of September 19th, 2026.

Why these numbers: Resolves in 2027 whatever the window, so the number is flat. Published attrition in the program is substantial; arriving already adapted to its physical load from earlier training is the reason for a number this high. Personal, mine to move.

What this one is worth

If this happened tomorrow and nothing else changed, the chance that I live and work off Earth by 2071 goes from 0.5% to 0.5% (too small to tell apart from chance). If it turned out no, the same number goes to 0.5% (too small to tell apart from chance).

Longevity scenario baseline2071 ± 8moderate2080strong2095radical2136openno deadline
The headline as it stands 0.5%1.2%3.8%11%15%
If this settled yes now 0.5%1.2%3.8%11%15%
If this settled no now 0.5%1.2%3.8%11%15%

This is what the site says in advance, before the thing happens. When it does, the ledger entry that records it quotes this figure beside what actually followed, so a reader can see whether the prediction held. Worked out at the run 2026-10-11-scan by holding this step at each outcome in turn and playing the whole tree out again, 20,000 times per scenario. That is a throw of the dice, so a move smaller than about 0.10 points is inside the noise rather than a finding.

Revisions

DateFieldFromToWhy
2026-09-25 name Wording that named my current career; withdrawn from public copy until May 2027 and kept in the repository's history I complete my current training program Decided September 25th, 2026 (definitions.md decision log): no public surface names my current career until I complete my training in May 2027. Same meaning; no probability or link moved.
2026-09-25 description Wording that named my current career; withdrawn from public copy until May 2027 and kept in the repository's history The gate on the whole branch. Everything downstream, in my current career or a civilian one, assumes the qualification. Expected May 2027. Decided September 25th, 2026 (definitions.md decision log): no public surface names my current career until I complete my training in May 2027. Same meaning; no probability or link moved.
2026-09-25 resolution Wording that named my current career; withdrawn from public copy until May 2027 and kept in the repository's history I complete my current training program, confirmed by a dated record of completion. Decided September 25th, 2026 (definitions.md decision log): no public surface names my current career until I complete my training in May 2027. Same meaning; no probability or link moved.
2026-09-25 source Wording that named my current career; withdrawn from public copy until May 2027 and kept in the repository's history The dated record of completion Decided September 25th, 2026 (definitions.md decision log): no public surface names my current career until I complete my training in May 2027. Same meaning; no probability or link moved.
2026-09-25 rationale Wording that named my current career; withdrawn from public copy until May 2027 and kept in the repository's history Resolves in 2027 whatever the window, so the number is flat. Published attrition in the program is substantial; arriving already adapted to its physical load from earlier training is the reason for a number this high. Personal, mine to move. Decided September 25th, 2026 (definitions.md decision log): no public surface names my current career until I complete my training in May 2027. Same meaning; no probability or link moved.
2026-10-03 id see data/snapshots/renamed-ids.toml A-current-training-completed Id only, and with it the page's address: the old id described my current career, which no public surface does until May 2027 (decided September 25th, 2026; the rename I approved October 3rd, 2026 on Claude's proposal). Name, criterion, numbers and links are unchanged. Saved runs keep the old id and are read through data/snapshots/renamed-ids.toml.

Think this estimate is wrong? Here's how to tell me, and what happens next. The record itself is data/A-access.toml in the public repository.